Equipment R&D and Manufacturing
Recovery of multi-layer cement consolidated casing

Multi-layer cement consolidated casing recovery process includes lifting, drilling, cutting and hoisting. Construction equipment includes casing lifting device, pipeline cutting tool and drilling equipment.

Casing lifting device consists of body, hydraulic power station, cable storage drum etc., with modular design structure that can achieve wireless remote control. Adopting upper and lower hydraulic clamps and hydraulic cylinder lifting, casing lifting drive is achieved and pipe segment hoist is equipped.

Pipeline cutting tool and drilling equipment are used for cutting and drilling vertical multi-layer cement casing. The equipment clamps and fixes casing at first, then performs cutting and drilling operations.

Pipeline cutting tool
Casing lifting device
Drilling Machine
Quick navigation
——
Contact us
——
Scan the code to follow
——
Address: No. 91, Huashi Road, Beichen Science and Technology Park, Tianjin Postal Code: 300409                      Telephone: +86 22 26899842, 26899872 Phone number: 17822227788                    Email: main@jycmt.com